No job matches that.
Loading…
Unchecked systems, gas and fire protection are excluded. Mechanical piping and ductwork are taken off separately from plumbing, so either can be bid alone; ductwork is reported in linear and square feet by size. Sanitary waste is separate from a procurement waste allowance.
Upload starts analysis automatically after preparation. Analysis includes four passes: piping, fixture/component census, dedicated sizing, and final audit. The $6 admission target is not a guaranteed maximum; limits may leave partial coverage. Upload and analyze authorizes this processing.
Checking analysis availability…
Prepare source evidence and apply a saved response to this page. Selection, service and size remain separate; unknown sizes require review.
Results cover the selected component only. Scale and complete-route length remain separate.